Construction of kinhin paths and ponds We kindly thank Leonhard Schrofer for these photographs Marking the course of the paths After use of cultivator After use of cultivator The soil for the hill is gathered The crane driver Sometimes there is a cable not marked anywhere… Earthwork for one of the ponds Contour of the new pond Serious digging Water starts to seep in Water comes out of the ground like a small fountain The pond begins to fill up Contours of two ponds with a path inbetween The water rises slowly The pond is finished The pond is finished Shards found in the ground Stones were dug up as well Breaking down the shed The shed is gone Neighbor Klaas comes to take a look Arrival of the workmen in the early morning The concrete spreader at the start of the path The first part is poured Connection with the bridge The path is growing Strenuous work! Turning a corner Continuing with the eastern part Jiun roshi, Modana Ajit and Klaas The north part is marked Pouring more concrete No words needed Handwork is needed as well Pouring the path between the ponds West and east connected Back at the beginning The team who designed the landscape garden